Annual report pursuant to Section 13 and 15(d)

SCHEDULE III-CONSOLIDATED REAL ESTATE AND ACCUMULATED DEPRECIATION (Details)

v3.24.0.1
SCHEDULE III-CONSOLIDATED REAL ESTATE AND ACCUMULATED DEPRECIATION (Details) - USD ($)
$ in Thousands
Dec. 31, 2023
Dec. 31, 2022
Dec. 31, 2021
Dec. 31, 2020
Gross Value at Close of Period        
Total Assets $ 1,288,352 $ 1,336,100 $ 1,215,072 $ 1,044,671
Accumulated Depreciation 174,379 141,317 $ 103,010 $ 69,563
Note balance 25,965 $ 58,124    
Investments at cost for income tax purposes 1,397,000      
Dumfries Loan [Member]        
Gross Value at Close of Period        
Note balance 11,034      
Rosedale Loan [Member]        
Gross Value at Close of Period        
Note balance 13,563      
Land & Improvements        
Initial Costs        
Land & Improvement 184,227      
Costs Capitalized Subsequent to Acquisition        
Land & Improvements 2,063      
Gross Value at Close of Period        
Land & Improvements 186,290      
Buildings        
Initial Costs        
Building & Improvements 1,078,070      
Costs Capitalized Subsequent to Acquisition        
Building & Improvements 23,992      
Gross Value at Close of Period        
Building & Improvements 1,102,062      
Omaha-LTACH        
Gross Value at Close of Period        
Total Assets 21,867      
Accumulated Depreciation 5,233      
Omaha-LTACH | Buildings        
Initial Costs        
Building & Improvements 21,867      
Gross Value at Close of Period        
Building & Improvements 21,867      
Asheville-ASC        
Gross Value at Close of Period        
Total Assets 2,506      
Accumulated Depreciation 449      
Asheville-ASC | Land & Improvements        
Initial Costs        
Land & Improvement 572      
Gross Value at Close of Period        
Land & Improvements 572      
Asheville-ASC | Buildings        
Initial Costs        
Building & Improvements 1,934      
Gross Value at Close of Period        
Building & Improvements 1,934      
Pittsburgh-MOB/ASC        
Gross Value at Close of Period        
Total Assets 11,609      
Accumulated Depreciation 2,134      
Pittsburgh-MOB/ASC | Land & Improvements        
Initial Costs        
Land & Improvement 1,287      
Gross Value at Close of Period        
Land & Improvements 1,287      
Pittsburgh-MOB/ASC | Buildings        
Initial Costs        
Building & Improvements 10,322      
Gross Value at Close of Period        
Building & Improvements 10,322      
Memphis-MOB/ASC        
Gross Value at Close of Period        
Total Assets 20,156      
Accumulated Depreciation 3,475      
Memphis-MOB/ASC | Land & Improvements        
Initial Costs        
Land & Improvement 2,705      
Gross Value at Close of Period        
Land & Improvements 2,705      
Memphis-MOB/ASC | Buildings        
Initial Costs        
Building & Improvements 17,451      
Gross Value at Close of Period        
Building & Improvements 17,451      
Plano-Surgical Hospital        
Gross Value at Close of Period        
Total Assets 17,746      
Accumulated Depreciation 3,309      
Plano-Surgical Hospital | Land & Improvements        
Initial Costs        
Land & Improvement 1,050      
Gross Value at Close of Period        
Land & Improvements 1,050      
Plano-Surgical Hospital | Buildings        
Initial Costs        
Building & Improvements 16,696      
Gross Value at Close of Period        
Building & Improvements 16,696      
Westland-MOB/ASC        
Gross Value at Close of Period        
Total Assets 4,833      
Accumulated Depreciation 876      
Westland-MOB/ASC | Land & Improvements        
Initial Costs        
Land & Improvement 230      
Gross Value at Close of Period        
Land & Improvements 230      
Westland-MOB/ASC | Buildings        
Initial Costs        
Building & Improvements 4,520      
Costs Capitalized Subsequent to Acquisition        
Building & Improvements 83      
Gross Value at Close of Period        
Building & Improvements 4,603      
Melbourne-MOB/ Imaging        
Gross Value at Close of Period        
Total Assets 16,825      
Accumulated Depreciation 2,836      
Melbourne-MOB/ Imaging | Land & Improvements        
Initial Costs        
Land & Improvement 1,200      
Costs Capitalized Subsequent to Acquisition        
Land & Improvements 45      
Gross Value at Close of Period        
Land & Improvements 1,245      
Melbourne-MOB/ Imaging | Buildings        
Initial Costs        
Building & Improvements 14,250      
Costs Capitalized Subsequent to Acquisition        
Building & Improvements 1,330      
Gross Value at Close of Period        
Building & Improvements 15,580      
Reading-MOB/ASC        
Gross Value at Close of Period        
Total Assets 9,380      
Accumulated Depreciation 1,479      
Reading-MOB/ASC | Land & Improvements        
Initial Costs        
Land & Improvement 1,440      
Gross Value at Close of Period        
Land & Improvements 1,440      
Reading-MOB/ASC | Buildings        
Initial Costs        
Building & Improvements 7,940      
Gross Value at Close of Period        
Building & Improvements 7,940      
East Orange-MOB        
Gross Value at Close of Period        
Total Assets 12,772      
Accumulated Depreciation 1,869      
East Orange-MOB | Land & Improvements        
Initial Costs        
Land & Improvement 2,150      
Gross Value at Close of Period        
Land & Improvements 2,150      
East Orange-MOB | Buildings        
Initial Costs        
Building & Improvements 10,112      
Costs Capitalized Subsequent to Acquisition        
Building & Improvements 510      
Gross Value at Close of Period        
Building & Improvements 10,622      
Watertown- MOB/ Imaging        
Gross Value at Close of Period        
Total Assets 9,629      
Accumulated Depreciation 1,520      
Watertown- MOB/ Imaging | Land & Improvements        
Initial Costs        
Land & Improvement 1,100      
Costs Capitalized Subsequent to Acquisition        
Land & Improvements 192      
Gross Value at Close of Period        
Land & Improvements 1,292      
Watertown- MOB/ Imaging | Buildings        
Initial Costs        
Building & Improvements 8,002      
Costs Capitalized Subsequent to Acquisition        
Building & Improvements 335      
Gross Value at Close of Period        
Building & Improvements 8,337      
Sandusky-MOB        
Gross Value at Close of Period        
Total Assets 11,501      
Accumulated Depreciation 2,147      
Sandusky-MOB | Land & Improvements        
Initial Costs        
Land & Improvement 791      
Gross Value at Close of Period        
Land & Improvements 791      
Sandusky-MOB | Buildings        
Initial Costs        
Building & Improvements 10,710      
Gross Value at Close of Period        
Building & Improvements 10,710      
Carson City-MOB        
Gross Value at Close of Period        
Total Assets 4,028      
Accumulated Depreciation 586      
Carson City-MOB | Land & Improvements        
Initial Costs        
Land & Improvement 760      
Gross Value at Close of Period        
Land & Improvements 760      
Carson City-MOB | Buildings        
Initial Costs        
Building & Improvements 3,268      
Gross Value at Close of Period        
Building & Improvements 3,268      
Ellijay-MOB        
Gross Value at Close of Period        
Total Assets 4,251      
Accumulated Depreciation 914      
Ellijay-MOB | Land & Improvements        
Initial Costs        
Land & Improvement 914      
Gross Value at Close of Period        
Land & Improvements 914      
Ellijay-MOB | Buildings        
Initial Costs        
Building & Improvements 3,337      
Gross Value at Close of Period        
Building & Improvements 3,337      
Altoona-IRF        
Gross Value at Close of Period        
Total Assets 19,689      
Accumulated Depreciation 3,653      
Altoona-IRF | Land & Improvements        
Initial Costs        
Land & Improvement 1,184      
Gross Value at Close of Period        
Land & Improvements 1,184      
Altoona-IRF | Buildings        
Initial Costs        
Building & Improvements 18,505      
Gross Value at Close of Period        
Building & Improvements 18,505      
Mechanicsburg-IRF        
Gross Value at Close of Period        
Total Assets 22,261      
Accumulated Depreciation 4,133      
Mechanicsburg-IRF | Land & Improvements        
Initial Costs        
Land & Improvement 810      
Gross Value at Close of Period        
Land & Improvements 810      
Mechanicsburg-IRF | Buildings        
Initial Costs        
Building & Improvements 21,451      
Gross Value at Close of Period        
Building & Improvements 21,451      
Mesa-IRF        
Gross Value at Close of Period        
Total Assets 19,885      
Accumulated Depreciation 3,732      
Mesa-IRF | Land & Improvements        
Initial Costs        
Land & Improvement 3,620      
Gross Value at Close of Period        
Land & Improvements 3,620      
Mesa-IRF | Buildings        
Initial Costs        
Building & Improvements 16,265      
Gross Value at Close of Period        
Building & Improvements 16,265      
Lewisburg-MOB/ Imaging        
Gross Value at Close of Period        
Total Assets 6,795      
Accumulated Depreciation 1,544      
Lewisburg-MOB/ Imaging | Land & Improvements        
Initial Costs        
Land & Improvement 681      
Gross Value at Close of Period        
Land & Improvements 681      
Lewisburg-MOB/ Imaging | Buildings        
Initial Costs        
Building & Improvements 6,114      
Gross Value at Close of Period        
Building & Improvements 6,114      
Cape Coral-MOB        
Gross Value at Close of Period        
Total Assets 7,370      
Accumulated Depreciation 977      
Cape Coral-MOB | Land & Improvements        
Initial Costs        
Land & Improvement 353      
Gross Value at Close of Period        
Land & Improvements 353      
Cape Coral-MOB | Buildings        
Initial Costs        
Building & Improvements 7,017      
Gross Value at Close of Period        
Building & Improvements 7,017      
Las Cruces-MOB        
Gross Value at Close of Period        
Total Assets 5,087      
Accumulated Depreciation 926      
Las Cruces-MOB | Land & Improvements        
Initial Costs        
Land & Improvement 397      
Costs Capitalized Subsequent to Acquisition        
Land & Improvements 40      
Gross Value at Close of Period        
Land & Improvements 437      
Las Cruces-MOB | Buildings        
Initial Costs        
Building & Improvements 4,618      
Costs Capitalized Subsequent to Acquisition        
Building & Improvements 32      
Gross Value at Close of Period        
Building & Improvements 4,650      
Clermont-MOB        
Gross Value at Close of Period        
Total Assets 4,567      
Accumulated Depreciation 717      
Clermont-MOB | Land & Improvements        
Initial Costs        
Land & Improvement 145      
Gross Value at Close of Period        
Land & Improvements 145      
Clermont-MOB | Buildings        
Initial Costs        
Building & Improvements 4,422      
Gross Value at Close of Period        
Building & Improvements 4,422      
Brockport-MOB        
Gross Value at Close of Period        
Total Assets 7,790      
Accumulated Depreciation 1,566      
Brockport-MOB | Land & Improvements        
Initial Costs        
Land & Improvement 693      
Gross Value at Close of Period        
Land & Improvements 693      
Brockport-MOB | Buildings        
Initial Costs        
Building & Improvements 7,097      
Gross Value at Close of Period        
Building & Improvements 7,097      
Flower Mound-ASC        
Gross Value at Close of Period        
Total Assets 3,885      
Accumulated Depreciation 698      
Flower Mound-ASC | Land & Improvements        
Initial Costs        
Land & Improvement 730      
Gross Value at Close of Period        
Land & Improvements 730      
Flower Mound-ASC | Buildings        
Initial Costs        
Building & Improvements 3,155      
Gross Value at Close of Period        
Building & Improvements 3,155      
Sherman-IRF/ LTACH        
Gross Value at Close of Period        
Total Assets 29,059      
Accumulated Depreciation 4,566      
Sherman-IRF/ LTACH | Land & Improvements        
Initial Costs        
Land & Improvement 1,601      
Gross Value at Close of Period        
Land & Improvements 1,601      
Sherman-IRF/ LTACH | Buildings        
Initial Costs        
Building & Improvements 25,011      
Costs Capitalized Subsequent to Acquisition        
Building & Improvements 2,447      
Gross Value at Close of Period        
Building & Improvements 27,458      
Lubbock-MOB        
Gross Value at Close of Period        
Total Assets 7,291      
Accumulated Depreciation 1,449      
Lubbock-MOB | Land & Improvements        
Initial Costs        
Land & Improvement 1,566      
Gross Value at Close of Period        
Land & Improvements 1,566      
Lubbock-MOB | Buildings        
Initial Costs        
Building & Improvements 5,725      
Gross Value at Close of Period        
Building & Improvements 5,725      
Austin-IRF        
Gross Value at Close of Period        
Total Assets 36,839      
Accumulated Depreciation 4,806      
Austin-IRF | Land & Improvements        
Initial Costs        
Land & Improvement 7,223      
Gross Value at Close of Period        
Land & Improvements 7,223      
Austin-IRF | Buildings        
Initial Costs        
Building & Improvements 29,616      
Gross Value at Close of Period        
Building & Improvements 29,616      
Fort Worth-MOB        
Gross Value at Close of Period        
Total Assets 5,464      
Accumulated Depreciation 801      
Fort Worth-MOB | Land & Improvements        
Initial Costs        
Land & Improvement 1,738      
Gross Value at Close of Period        
Land & Improvements 1,738      
Fort Worth-MOB | Buildings        
Initial Costs        
Building & Improvements 3,726      
Gross Value at Close of Period        
Building & Improvements 3,726      
Albertville-MOB        
Gross Value at Close of Period        
Total Assets 5,820      
Accumulated Depreciation 1,494      
Albertville-MOB | Land & Improvements        
Initial Costs        
Land & Improvement 1,154      
Costs Capitalized Subsequent to Acquisition        
Land & Improvements 193      
Gross Value at Close of Period        
Land & Improvements 1,347      
Albertville-MOB | Buildings        
Initial Costs        
Building & Improvements 4,444      
Costs Capitalized Subsequent to Acquisition        
Building & Improvements 29      
Gross Value at Close of Period        
Building & Improvements 4,473      
Moline-MOB/ASC        
Gross Value at Close of Period        
Total Assets 10,091      
Accumulated Depreciation 1,932      
Moline-MOB/ASC | Land & Improvements        
Initial Costs        
Land & Improvement 854      
Gross Value at Close of Period        
Land & Improvements 854      
Moline-MOB/ASC | Buildings        
Initial Costs        
Building & Improvements 9,237      
Gross Value at Close of Period        
Building & Improvements 9,237      
Lee's Summit-MOB        
Gross Value at Close of Period        
Total Assets 3,500      
Accumulated Depreciation 933      
Lee's Summit-MOB | Land & Improvements        
Initial Costs        
Land & Improvement 571      
Gross Value at Close of Period        
Land & Improvements 571      
Lee's Summit-MOB | Buildings        
Initial Costs        
Building & Improvements 2,929      
Gross Value at Close of Period        
Building & Improvements 2,929      
Amarillo-MOB        
Gross Value at Close of Period        
Total Assets 8,691      
Accumulated Depreciation 989      
Amarillo-MOB | Land & Improvements        
Initial Costs        
Land & Improvement 1,437      
Gross Value at Close of Period        
Land & Improvements 1,437      
Amarillo-MOB | Buildings        
Initial Costs        
Building & Improvements 7,254      
Gross Value at Close of Period        
Building & Improvements 7,254      
Wyomissing-MOB        
Gross Value at Close of Period        
Total Assets 5,737      
Accumulated Depreciation 700      
Wyomissing-MOB | Land & Improvements        
Initial Costs        
Land & Improvement 487      
Gross Value at Close of Period        
Land & Improvements 487      
Wyomissing-MOB | Buildings        
Initial Costs        
Building & Improvements 5,250      
Gross Value at Close of Period        
Building & Improvements 5,250      
Saint George-MOB/ASC        
Gross Value at Close of Period        
Total Assets 5,883      
Accumulated Depreciation 812      
Saint George-MOB/ASC | Land & Improvements        
Initial Costs        
Land & Improvement 435      
Gross Value at Close of Period        
Land & Improvements 435      
Saint George-MOB/ASC | Buildings        
Initial Costs        
Building & Improvements 5,372      
Costs Capitalized Subsequent to Acquisition        
Building & Improvements 76      
Gross Value at Close of Period        
Building & Improvements 5,448      
Silvis-MOB        
Gross Value at Close of Period        
Total Assets 6,857      
Accumulated Depreciation 1,625      
Silvis-MOB | Land & Improvements        
Initial Costs        
Land & Improvement 249      
Costs Capitalized Subsequent to Acquisition        
Land & Improvements 30      
Gross Value at Close of Period        
Land & Improvements 279      
Silvis-MOB | Buildings        
Initial Costs        
Building & Improvements 5,862      
Costs Capitalized Subsequent to Acquisition        
Building & Improvements 716      
Gross Value at Close of Period        
Building & Improvements 6,578      
Fremont-MOB        
Gross Value at Close of Period        
Total Assets 8,497      
Accumulated Depreciation 1,170      
Fremont-MOB | Land & Improvements        
Initial Costs        
Land & Improvement 162      
Gross Value at Close of Period        
Land & Improvements 162      
Fremont-MOB | Buildings        
Initial Costs        
Building & Improvements 8,335      
Gross Value at Close of Period        
Building & Improvements 8,335      
Gainesville-MOB/ASC        
Gross Value at Close of Period        
Total Assets 11,234      
Accumulated Depreciation 1,537      
Gainesville-MOB/ASC | Land & Improvements        
Initial Costs        
Land & Improvement 625      
Gross Value at Close of Period        
Land & Improvements 625      
Gainesville-MOB/ASC | Buildings        
Initial Costs        
Building & Improvements 9,885      
Costs Capitalized Subsequent to Acquisition        
Building & Improvements 724      
Gross Value at Close of Period        
Building & Improvements 10,609      
East Dallas-Acute Hospital        
Gross Value at Close of Period        
Total Assets 24,734      
Accumulated Depreciation 3,610      
East Dallas-Acute Hospital | Land & Improvements        
Initial Costs        
Land & Improvement 6,272      
Gross Value at Close of Period        
Land & Improvements 6,272      
East Dallas-Acute Hospital | Buildings        
Initial Costs        
Building & Improvements 17,012      
Costs Capitalized Subsequent to Acquisition        
Building & Improvements 1,450      
Gross Value at Close of Period        
Building & Improvements 18,462      
Orlando-MOB        
Gross Value at Close of Period        
Total Assets 15,129      
Accumulated Depreciation 2,286      
Orlando-MOB | Land & Improvements        
Initial Costs        
Land & Improvement 3,075      
Gross Value at Close of Period        
Land & Improvements 3,075      
Orlando-MOB | Buildings        
Initial Costs        
Building & Improvements 11,944      
Costs Capitalized Subsequent to Acquisition        
Building & Improvements 110      
Gross Value at Close of Period        
Building & Improvements 12,054      
Belpre-MOB/ Imaging/ER/ ASC        
Gross Value at Close of Period        
Total Assets 57,517      
Accumulated Depreciation 8,352      
Belpre-MOB/ Imaging/ER/ ASC | Land & Improvements        
Initial Costs        
Land & Improvement 3,997      
Gross Value at Close of Period        
Land & Improvements 3,997      
Belpre-MOB/ Imaging/ER/ ASC | Buildings        
Initial Costs        
Building & Improvements 53,520      
Gross Value at Close of Period        
Building & Improvements 53,520      
McAllen-MOB        
Gross Value at Close of Period        
Total Assets 5,395      
Accumulated Depreciation 787      
McAllen-MOB | Land & Improvements        
Initial Costs        
Land & Improvement 1,099      
Gross Value at Close of Period        
Land & Improvements 1,099      
McAllen-MOB | Buildings        
Initial Costs        
Building & Improvements 4,296      
Gross Value at Close of Period        
Building & Improvements 4,296      
Derby-ASC        
Gross Value at Close of Period        
Total Assets 3,207      
Accumulated Depreciation 597      
Derby-ASC | Land & Improvements        
Initial Costs        
Land & Improvement 567      
Gross Value at Close of Period        
Land & Improvements 567      
Derby-ASC | Buildings        
Initial Costs        
Building & Improvements 2,585      
Costs Capitalized Subsequent to Acquisition        
Building & Improvements 55      
Gross Value at Close of Period        
Building & Improvements 2,640      
Bountiful-MOB        
Gross Value at Close of Period        
Total Assets 5,014      
Accumulated Depreciation 599      
Bountiful-MOB | Land & Improvements        
Initial Costs        
Land & Improvement 720      
Gross Value at Close of Period        
Land & Improvements 720      
Bountiful-MOB | Buildings        
Initial Costs        
Building & Improvements 4,185      
Costs Capitalized Subsequent to Acquisition        
Building & Improvements 109      
Gross Value at Close of Period        
Building & Improvements 4,294      
Cincinnati-MOB        
Gross Value at Close of Period        
Total Assets 3,669      
Accumulated Depreciation 676      
Cincinnati-MOB | Land & Improvements        
Initial Costs        
Land & Improvement 1,823      
Costs Capitalized Subsequent to Acquisition        
Land & Improvements 35      
Gross Value at Close of Period        
Land & Improvements 1,858      
Cincinnati-MOB | Buildings        
Initial Costs        
Building & Improvements 1,811      
Gross Value at Close of Period        
Building & Improvements 1,811      
Melbourne Pine-Cancer Center        
Gross Value at Close of Period        
Total Assets 7,361      
Accumulated Depreciation 1,015      
Melbourne Pine-Cancer Center | Land & Improvements        
Initial Costs        
Land & Improvement 732      
Gross Value at Close of Period        
Land & Improvements 732      
Melbourne Pine-Cancer Center | Buildings        
Initial Costs        
Building & Improvements 5,980      
Costs Capitalized Subsequent to Acquisition        
Building & Improvements 649      
Gross Value at Close of Period        
Building & Improvements 6,629      
Southern IL-MOB        
Gross Value at Close of Period        
Total Assets 14,666      
Accumulated Depreciation 1,879      
Southern IL-MOB | Land & Improvements        
Initial Costs        
Land & Improvement 1,830      
Gross Value at Close of Period        
Land & Improvements 1,830      
Southern IL-MOB | Buildings        
Initial Costs        
Building & Improvements 12,660      
Costs Capitalized Subsequent to Acquisition        
Building & Improvements 176      
Gross Value at Close of Period        
Building & Improvements 12,836      
Vernon-MOB/ Dialysis/ Administrative        
Gross Value at Close of Period        
Total Assets 11,095      
Accumulated Depreciation 1,693      
Vernon-MOB/ Dialysis/ Administrative | Land & Improvements        
Initial Costs        
Land & Improvement 1,166      
Gross Value at Close of Period        
Land & Improvements 1,166      
Vernon-MOB/ Dialysis/ Administrative | Buildings        
Initial Costs        
Building & Improvements 9,929      
Gross Value at Close of Period        
Building & Improvements 9,929      
Corona        
Gross Value at Close of Period        
Total Assets 16,290      
Accumulated Depreciation 1,837      
Corona | Land & Improvements        
Initial Costs        
Land & Improvement 1,601      
Gross Value at Close of Period        
Land & Improvements 1,601      
Corona | Buildings        
Initial Costs        
Building & Improvements 14,689      
Gross Value at Close of Period        
Building & Improvements 14,689      
Zachary-LTACH        
Gross Value at Close of Period        
Total Assets 3,848      
Accumulated Depreciation 553      
Zachary-LTACH | Land & Improvements        
Initial Costs        
Land & Improvement 103      
Gross Value at Close of Period        
Land & Improvements 103      
Zachary-LTACH | Buildings        
Initial Costs        
Building & Improvements 3,745      
Gross Value at Close of Period        
Building & Improvements 3,745      
Chandler -MOB/ASC        
Gross Value at Close of Period        
Total Assets 16,290      
Accumulated Depreciation 1,689      
Chandler -MOB/ASC | Land & Improvements        
Initial Costs        
Land & Improvement 4,616      
Gross Value at Close of Period        
Land & Improvements 4,616      
Chandler -MOB/ASC | Buildings        
Initial Costs        
Building & Improvements 11,643      
Costs Capitalized Subsequent to Acquisition        
Building & Improvements 31      
Gross Value at Close of Period        
Building & Improvements 11,674      
GMR Surprise-IRF        
Gross Value at Close of Period        
Total Assets 24,860      
Accumulated Depreciation 3,705      
GMR Surprise-IRF | Land & Improvements        
Initial Costs        
Land & Improvement 1,966      
Costs Capitalized Subsequent to Acquisition        
Land & Improvements 38      
Gross Value at Close of Period        
Land & Improvements 2,004      
GMR Surprise-IRF | Buildings        
Initial Costs        
Building & Improvements 22,856      
Gross Value at Close of Period        
Building & Improvements 22,856      
South Bend-IRF        
Gross Value at Close of Period        
Total Assets 13,880      
Accumulated Depreciation 2,905      
South Bend-IRF | Land & Improvements        
Initial Costs        
Land & Improvement 1,998      
Gross Value at Close of Period        
Land & Improvements 1,998      
South Bend-IRF | Buildings        
Initial Costs        
Building & Improvements 11,882      
Gross Value at Close of Period        
Building & Improvements 11,882      
Las Vegas-IRF        
Gross Value at Close of Period        
Total Assets 20,205      
Accumulated Depreciation 3,794      
Las Vegas-IRF | Land & Improvements        
Initial Costs        
Land & Improvement 2,723      
Gross Value at Close of Period        
Land & Improvements 2,723      
Las Vegas-IRF | Buildings        
Initial Costs        
Building & Improvements 17,482      
Gross Value at Close of Period        
Building & Improvements 17,482      
Oklahoma Northwest-IRF        
Gross Value at Close of Period        
Total Assets 31,988      
Accumulated Depreciation 4,161      
Oklahoma Northwest-IRF | Land & Improvements        
Initial Costs        
Land & Improvement 2,507      
Costs Capitalized Subsequent to Acquisition        
Land & Improvements 122      
Gross Value at Close of Period        
Land & Improvements 2,629      
Oklahoma Northwest-IRF | Buildings        
Initial Costs        
Building & Improvements 22,545      
Costs Capitalized Subsequent to Acquisition        
Building & Improvements 6,814      
Gross Value at Close of Period        
Building & Improvements 29,359      
San Marcos-Cancer Center        
Gross Value at Close of Period        
Total Assets 9,786      
Accumulated Depreciation 1,090      
San Marcos-Cancer Center | Land & Improvements        
Initial Costs        
Land & Improvement 2,448      
Gross Value at Close of Period        
Land & Improvements 2,448      
San Marcos-Cancer Center | Buildings        
Initial Costs        
Building & Improvements 7,338      
Gross Value at Close of Period        
Building & Improvements 7,338      
Lansing Patient-MOB /ASC        
Gross Value at Close of Period        
Total Assets 10,203      
Accumulated Depreciation 1,746      
Lansing Patient-MOB /ASC | Land & Improvements        
Initial Costs        
Land & Improvement 1,387      
Costs Capitalized Subsequent to Acquisition        
Land & Improvements 188      
Gross Value at Close of Period        
Land & Improvements 1,575      
Lansing Patient-MOB /ASC | Buildings        
Initial Costs        
Building & Improvements 8,348      
Costs Capitalized Subsequent to Acquisition        
Building & Improvements 280      
Gross Value at Close of Period        
Building & Improvements 8,628      
Bannockburn-MOB        
Gross Value at Close of Period        
Total Assets 6,532      
Accumulated Depreciation 1,718      
Bannockburn-MOB | Land & Improvements        
Initial Costs        
Land & Improvement 895      
Costs Capitalized Subsequent to Acquisition        
Land & Improvements 123      
Gross Value at Close of Period        
Land & Improvements 1,018      
Bannockburn-MOB | Buildings        
Initial Costs        
Building & Improvements 4,700      
Costs Capitalized Subsequent to Acquisition        
Building & Improvements 814      
Gross Value at Close of Period        
Building & Improvements 5,514      
Aurora-Office        
Gross Value at Close of Period        
Total Assets 9,878      
Accumulated Depreciation 1,412      
Aurora-Office | Land & Improvements        
Initial Costs        
Land & Improvement 1,829      
Gross Value at Close of Period        
Land & Improvements 1,829      
Aurora-Office | Buildings        
Initial Costs        
Building & Improvements 8,049      
Gross Value at Close of Period        
Building & Improvements 8,049      
Livonia-MOB/Urgent Care        
Gross Value at Close of Period        
Total Assets 10,207      
Accumulated Depreciation 2,097      
Livonia-MOB/Urgent Care | Land & Improvements        
Initial Costs        
Land & Improvement 1,181      
Costs Capitalized Subsequent to Acquisition        
Land & Improvements 45      
Gross Value at Close of Period        
Land & Improvements 1,226      
Livonia-MOB/Urgent Care | Buildings        
Initial Costs        
Building & Improvements 8,071      
Costs Capitalized Subsequent to Acquisition        
Building & Improvements 910      
Gross Value at Close of Period        
Building & Improvements 8,981      
Gilbert-MOB/ASC        
Gross Value at Close of Period        
Total Assets 4,859      
Accumulated Depreciation 455      
Gilbert-MOB/ASC | Land & Improvements        
Initial Costs        
Land & Improvement 2,470      
Gross Value at Close of Period        
Land & Improvements 2,470      
Gilbert-MOB/ASC | Buildings        
Initial Costs        
Building & Improvements 2,389      
Gross Value at Close of Period        
Building & Improvements 2,389      
Morgantown-Office        
Gross Value at Close of Period        
Total Assets 7,048      
Accumulated Depreciation 881      
Morgantown-Office | Land & Improvements        
Initial Costs        
Land & Improvement 1,256      
Gross Value at Close of Period        
Land & Improvements 1,256      
Morgantown-Office | Buildings        
Initial Costs        
Building & Improvements 5,792      
Gross Value at Close of Period        
Building & Improvements 5,792      
Beaumont-Surgical Hospital        
Gross Value at Close of Period        
Total Assets 29,293      
Accumulated Depreciation 3,069      
Beaumont-Surgical Hospital | Land & Improvements        
Initial Costs        
Land & Improvement 3,421      
Gross Value at Close of Period        
Land & Improvements 3,421      
Beaumont-Surgical Hospital | Buildings        
Initial Costs        
Building & Improvements 25,872      
Gross Value at Close of Period        
Building & Improvements 25,872      
Bastrop-Freestanding ED        
Gross Value at Close of Period        
Total Assets 10,751      
Accumulated Depreciation 1,169      
Bastrop-Freestanding ED | Land & Improvements        
Initial Costs        
Land & Improvement 2,039      
Gross Value at Close of Period        
Land & Improvements 2,039      
Bastrop-Freestanding ED | Buildings        
Initial Costs        
Building & Improvements 8,712      
Gross Value at Close of Period        
Building & Improvements 8,712      
Panama City-MOB/ASC        
Gross Value at Close of Period        
Total Assets 11,497      
Accumulated Depreciation 1,511      
Panama City-MOB/ASC | Land & Improvements        
Initial Costs        
Land & Improvement 1,779      
Gross Value at Close of Period        
Land & Improvements 1,779      
Panama City-MOB/ASC | Buildings        
Initial Costs        
Building & Improvements 9,718      
Gross Value at Close of Period        
Building & Improvements 9,718      
Jacksonville-MOB        
Gross Value at Close of Period        
Total Assets 5,019      
Accumulated Depreciation 517      
Jacksonville-MOB | Buildings        
Initial Costs        
Building & Improvements 5,019      
Gross Value at Close of Period        
Building & Improvements 5,019      
Greenwood-MOB/ASC        
Gross Value at Close of Period        
Total Assets 5,848      
Accumulated Depreciation 793      
Greenwood-MOB/ASC | Land & Improvements        
Initial Costs        
Land & Improvement 892      
Gross Value at Close of Period        
Land & Improvements 892      
Greenwood-MOB/ASC | Buildings        
Initial Costs        
Building & Improvements 4,956      
Gross Value at Close of Period        
Building & Improvements 4,956      
Clinton-MOB/ASC        
Gross Value at Close of Period        
Total Assets 10,603      
Accumulated Depreciation 3,055      
Clinton-MOB/ASC | Land & Improvements        
Initial Costs        
Land & Improvement 1,006      
Costs Capitalized Subsequent to Acquisition        
Land & Improvements 293      
Gross Value at Close of Period        
Land & Improvements 1,299      
Clinton-MOB/ASC | Buildings        
Initial Costs        
Building & Improvements 8,129      
Costs Capitalized Subsequent to Acquisition        
Building & Improvements 1,175      
Gross Value at Close of Period        
Building & Improvements 9,304      
High Point-MOB        
Gross Value at Close of Period        
Total Assets 23,456      
Accumulated Depreciation 3,111      
High Point-MOB | Land & Improvements        
Initial Costs        
Land & Improvement 2,189      
Gross Value at Close of Period        
Land & Improvements 2,189      
High Point-MOB | Buildings        
Initial Costs        
Building & Improvements 21,236      
Costs Capitalized Subsequent to Acquisition        
Building & Improvements 31      
Gross Value at Close of Period        
Building & Improvements 21,267      
West Allis-MOB        
Gross Value at Close of Period        
Total Assets 8,896      
Accumulated Depreciation 989      
West Allis-MOB | Land & Improvements        
Initial Costs        
Land & Improvement 1,111      
Gross Value at Close of Period        
Land & Improvements 1,111      
West Allis-MOB | Buildings        
Initial Costs        
Building & Improvements 7,785      
Gross Value at Close of Period        
Building & Improvements 7,785      
Grand Rapids-MOB/ASC        
Gross Value at Close of Period        
Total Assets 21,968      
Accumulated Depreciation 2,952      
Grand Rapids-MOB/ASC | Land & Improvements        
Initial Costs        
Land & Improvement 3,421      
Costs Capitalized Subsequent to Acquisition        
Land & Improvements 292      
Gross Value at Close of Period        
Land & Improvements 3,713      
Grand Rapids-MOB/ASC | Buildings        
Initial Costs        
Building & Improvements 17,810      
Costs Capitalized Subsequent to Acquisition        
Building & Improvements 445      
Gross Value at Close of Period        
Building & Improvements 18,255      
Dumfries-MOB        
Gross Value at Close of Period        
Total Assets 17,749      
Accumulated Depreciation 5,174      
Dumfries-MOB | Land & Improvements        
Initial Costs        
Land & Improvement 2,886      
Gross Value at Close of Period        
Land & Improvements 2,886      
Dumfries-MOB | Buildings        
Initial Costs        
Building & Improvements 14,863      
Gross Value at Close of Period        
Building & Improvements 14,863      
Centerville -MOB        
Gross Value at Close of Period        
Total Assets 4,570      
Accumulated Depreciation 441      
Centerville -MOB | Land & Improvements        
Initial Costs        
Land & Improvement 160      
Gross Value at Close of Period        
Land & Improvements 160      
Centerville -MOB | Buildings        
Initial Costs        
Building & Improvements 4,410      
Gross Value at Close of Period        
Building & Improvements 4,410      
Fairfax-MOB        
Gross Value at Close of Period        
Total Assets 17,658      
Accumulated Depreciation 2,070      
Fairfax-MOB | Land & Improvements        
Initial Costs        
Land & Improvement 7,112      
Gross Value at Close of Period        
Land & Improvements 7,112      
Fairfax-MOB | Buildings        
Initial Costs        
Building & Improvements 9,621      
Costs Capitalized Subsequent to Acquisition        
Building & Improvements 925      
Gross Value at Close of Period        
Building & Improvements 10,546      
Rosedale-MOB        
Gross Value at Close of Period        
Total Assets 21,209      
Accumulated Depreciation 2,293      
Rosedale-MOB | Land & Improvements        
Initial Costs        
Land & Improvement 3,423      
Gross Value at Close of Period        
Land & Improvements 3,423      
Rosedale-MOB | Buildings        
Initial Costs        
Building & Improvements 17,646      
Costs Capitalized Subsequent to Acquisition        
Building & Improvements 140      
Gross Value at Close of Period        
Building & Improvements 17,786      
Lancaster-Plasma Center        
Gross Value at Close of Period        
Total Assets 5,190      
Accumulated Depreciation 471      
Lancaster-Plasma Center | Land & Improvements        
Initial Costs        
Land & Improvement 805      
Gross Value at Close of Period        
Land & Improvements 805      
Lancaster-Plasma Center | Buildings        
Initial Costs        
Building & Improvements 4,385      
Gross Value at Close of Period        
Building & Improvements 4,385      
Winston Salem-MOB        
Gross Value at Close of Period        
Total Assets 8,492      
Accumulated Depreciation 904      
Winston Salem-MOB | Land & Improvements        
Initial Costs        
Land & Improvement 1,778      
Gross Value at Close of Period        
Land & Improvements 1,778      
Winston Salem-MOB | Buildings        
Initial Costs        
Building & Improvements 6,714      
Gross Value at Close of Period        
Building & Improvements 6,714      
Decatur-MOB        
Gross Value at Close of Period        
Total Assets 4,332      
Accumulated Depreciation 369      
Decatur-MOB | Land & Improvements        
Initial Costs        
Land & Improvement 1,626      
Gross Value at Close of Period        
Land & Improvements 1,626      
Decatur-MOB | Buildings        
Initial Costs        
Building & Improvements 2,706      
Gross Value at Close of Period        
Building & Improvements 2,706      
Jackson-MOB        
Gross Value at Close of Period        
Total Assets 5,625      
Accumulated Depreciation 498      
Jackson-MOB | Land & Improvements        
Initial Costs        
Land & Improvement 895      
Gross Value at Close of Period        
Land & Improvements 895      
Jackson-MOB | Buildings        
Initial Costs        
Building & Improvements 4,730      
Gross Value at Close of Period        
Building & Improvements 4,730      
Sheboygan-MOB        
Gross Value at Close of Period        
Total Assets 6,806      
Accumulated Depreciation 656      
Sheboygan-MOB | Land & Improvements        
Initial Costs        
Land & Improvement 583      
Gross Value at Close of Period        
Land & Improvements 583      
Sheboygan-MOB | Buildings        
Initial Costs        
Building & Improvements 6,223      
Gross Value at Close of Period        
Building & Improvements 6,223      
Plymouth-MOB        
Gross Value at Close of Period        
Total Assets 5,972      
Accumulated Depreciation 505      
Plymouth-MOB | Land & Improvements        
Initial Costs        
Land & Improvement 758      
Gross Value at Close of Period        
Land & Improvements 758      
Plymouth-MOB | Buildings        
Initial Costs        
Building & Improvements 5,214      
Gross Value at Close of Period        
Building & Improvements 5,214      
Spring Hill-MOB/Img        
Gross Value at Close of Period        
Total Assets 16,957      
Accumulated Depreciation 1,524      
Spring Hill-MOB/Img | Land & Improvements        
Initial Costs        
Land & Improvement 3,893      
Costs Capitalized Subsequent to Acquisition        
Land & Improvements 68      
Gross Value at Close of Period        
Land & Improvements 3,961      
Spring Hill-MOB/Img | Buildings        
Initial Costs        
Building & Improvements 12,954      
Costs Capitalized Subsequent to Acquisition        
Building & Improvements 42      
Gross Value at Close of Period        
Building & Improvements 12,996      
Cape Girardeau-ASC        
Gross Value at Close of Period        
Total Assets 6,088      
Accumulated Depreciation 565      
Cape Girardeau-ASC | Land & Improvements        
Initial Costs        
Land & Improvement 1,223      
Gross Value at Close of Period        
Land & Improvements 1,223      
Cape Girardeau-ASC | Buildings        
Initial Costs        
Building & Improvements 4,865      
Gross Value at Close of Period        
Building & Improvements 4,865      
Yuma-MOB        
Gross Value at Close of Period        
Total Assets 6,338      
Accumulated Depreciation 653      
Yuma-MOB | Land & Improvements        
Initial Costs        
Land & Improvement 1,349      
Gross Value at Close of Period        
Land & Improvements 1,349      
Yuma-MOB | Buildings        
Initial Costs        
Building & Improvements 4,989      
Gross Value at Close of Period        
Building & Improvements 4,989      
Las Vegas-MOB/ASC        
Gross Value at Close of Period        
Total Assets 7,124      
Accumulated Depreciation 511      
Las Vegas-MOB/ASC | Land & Improvements        
Initial Costs        
Land & Improvement 311      
Gross Value at Close of Period        
Land & Improvements 311      
Las Vegas-MOB/ASC | Buildings        
Initial Costs        
Building & Improvements 6,813      
Gross Value at Close of Period        
Building & Improvements 6,813      
Pensacola-MOB/ASC        
Gross Value at Close of Period        
Total Assets 8,271      
Accumulated Depreciation 858      
Pensacola-MOB/ASC | Land & Improvements        
Initial Costs        
Land & Improvement 2,118      
Gross Value at Close of Period        
Land & Improvements 2,118      
Pensacola-MOB/ASC | Buildings        
Initial Costs        
Building & Improvements 6,153      
Gross Value at Close of Period        
Building & Improvements 6,153      
Venice-MOB        
Gross Value at Close of Period        
Total Assets 6,433      
Accumulated Depreciation 604      
Venice-MOB | Land & Improvements        
Initial Costs        
Land & Improvement 1,896      
Gross Value at Close of Period        
Land & Improvements 1,896      
Venice-MOB | Buildings        
Initial Costs        
Building & Improvements 4,537      
Gross Value at Close of Period        
Building & Improvements 4,537      
El Paso-MOB        
Gross Value at Close of Period        
Total Assets 8,829      
Accumulated Depreciation 757      
El Paso-MOB | Land & Improvements        
Initial Costs        
Land & Improvement 970      
Gross Value at Close of Period        
Land & Improvements 970      
El Paso-MOB | Buildings        
Initial Costs        
Building & Improvements 7,709      
Costs Capitalized Subsequent to Acquisition        
Building & Improvements 150      
Gross Value at Close of Period        
Building & Improvements 7,859      
West El Paso-MOB/ASC        
Gross Value at Close of Period        
Total Assets 8,722      
Accumulated Depreciation 697      
West El Paso-MOB/ASC | Land & Improvements        
Initial Costs        
Land & Improvement 995      
Gross Value at Close of Period        
Land & Improvements 995      
West El Paso-MOB/ASC | Buildings        
Initial Costs        
Building & Improvements 7,727      
Gross Value at Close of Period        
Building & Improvements 7,727      
Syracuse-MOB        
Gross Value at Close of Period        
Total Assets 5,750      
Accumulated Depreciation 554      
Syracuse-MOB | Land & Improvements        
Initial Costs        
Land & Improvement 744      
Costs Capitalized Subsequent to Acquisition        
Land & Improvements 25      
Gross Value at Close of Period        
Land & Improvements 769      
Syracuse-MOB | Buildings        
Initial Costs        
Building & Improvements 4,880      
Costs Capitalized Subsequent to Acquisition        
Building & Improvements 101      
Gross Value at Close of Period        
Building & Improvements 4,981      
Fort Worth-Behavioral Hospital        
Gross Value at Close of Period        
Total Assets 15,413      
Accumulated Depreciation 1,063      
Fort Worth-Behavioral Hospital | Land & Improvements        
Initial Costs        
Land & Improvement 1,960      
Gross Value at Close of Period        
Land & Improvements 1,960      
Fort Worth-Behavioral Hospital | Buildings        
Initial Costs        
Building & Improvements 13,453      
Gross Value at Close of Period        
Building & Improvements 13,453      
Coos Bay-MOB        
Gross Value at Close of Period        
Total Assets 6,062      
Accumulated Depreciation 424      
Coos Bay-MOB | Land & Improvements        
Initial Costs        
Land & Improvement 917      
Gross Value at Close of Period        
Land & Improvements 917      
Coos Bay-MOB | Buildings        
Initial Costs        
Building & Improvements 5,145      
Gross Value at Close of Period        
Building & Improvements 5,145      
Port Saint Lucie-MOB/ASC        
Gross Value at Close of Period        
Total Assets 4,487      
Accumulated Depreciation 442      
Port Saint Lucie-MOB/ASC | Land & Improvements        
Initial Costs        
Land & Improvement 660      
Gross Value at Close of Period        
Land & Improvements 660      
Port Saint Lucie-MOB/ASC | Buildings        
Initial Costs        
Building & Improvements 3,767      
Costs Capitalized Subsequent to Acquisition        
Building & Improvements 60      
Gross Value at Close of Period        
Building & Improvements 3,827      
Dallas-MOB/ASC        
Gross Value at Close of Period        
Total Assets 6,388      
Accumulated Depreciation 427      
Dallas-MOB/ASC | Land & Improvements        
Initial Costs        
Land & Improvement 3,165      
Gross Value at Close of Period        
Land & Improvements 3,165      
Dallas-MOB/ASC | Buildings        
Initial Costs        
Building & Improvements 3,062      
Costs Capitalized Subsequent to Acquisition        
Building & Improvements 161      
Gross Value at Close of Period        
Building & Improvements 3,223      
Cape Coral-MOB1        
Gross Value at Close of Period        
Total Assets 27,390      
Accumulated Depreciation 2,387      
Cape Coral-MOB1 | Land & Improvements        
Initial Costs        
Land & Improvement 6,103      
Gross Value at Close of Period        
Land & Improvements 6,103      
Cape Coral-MOB1 | Buildings        
Initial Costs        
Building & Improvements 21,287      
Gross Value at Close of Period        
Building & Improvements 21,287      
East Grand Forks-MOB        
Gross Value at Close of Period        
Total Assets 8,186      
Accumulated Depreciation 1,090      
East Grand Forks-MOB | Land & Improvements        
Initial Costs        
Land & Improvement 1,123      
Gross Value at Close of Period        
Land & Improvements 1,123      
East Grand Forks-MOB | Buildings        
Initial Costs        
Building & Improvements 7,063      
Gross Value at Close of Period        
Building & Improvements 7,063      
Tallahassee-MOB        
Gross Value at Close of Period        
Total Assets 8,026      
Accumulated Depreciation 642      
Tallahassee-MOB | Land & Improvements        
Initial Costs        
Land & Improvement 919      
Gross Value at Close of Period        
Land & Improvements 919      
Tallahassee-MOB | Buildings        
Initial Costs        
Building & Improvements 7,107      
Gross Value at Close of Period        
Building & Improvements 7,107      
Caledonia-MOB        
Gross Value at Close of Period        
Total Assets 3,413      
Accumulated Depreciation 261      
Caledonia-MOB | Land & Improvements        
Initial Costs        
Land & Improvement 648      
Gross Value at Close of Period        
Land & Improvements 648      
Caledonia-MOB | Buildings        
Initial Costs        
Building & Improvements 2,765      
Gross Value at Close of Period        
Building & Improvements 2,765      
Forsyth-MOB/Imaging        
Gross Value at Close of Period        
Total Assets 12,103      
Accumulated Depreciation 1,001      
Forsyth-MOB/Imaging | Land & Improvements        
Initial Costs        
Land & Improvement 1,902      
Costs Capitalized Subsequent to Acquisition        
Land & Improvements 85      
Gross Value at Close of Period        
Land & Improvements 1,987      
Forsyth-MOB/Imaging | Buildings        
Initial Costs        
Building & Improvements 10,083      
Costs Capitalized Subsequent to Acquisition        
Building & Improvements 33      
Gross Value at Close of Period        
Building & Improvements 10,116      
Munster-MOB/ASC        
Gross Value at Close of Period        
Total Assets 5,813      
Accumulated Depreciation 523      
Munster-MOB/ASC | Land & Improvements        
Initial Costs        
Land & Improvement 941      
Gross Value at Close of Period        
Land & Improvements 941      
Munster-MOB/ASC | Buildings        
Initial Costs        
Building & Improvements 4,842      
Costs Capitalized Subsequent to Acquisition        
Building & Improvements 30      
Gross Value at Close of Period        
Building & Improvements 4,872      
Athens-MOB        
Gross Value at Close of Period        
Total Assets 4,811      
Accumulated Depreciation 344      
Athens-MOB | Land & Improvements        
Initial Costs        
Land & Improvement 622      
Gross Value at Close of Period        
Land & Improvements 622      
Athens-MOB | Buildings        
Initial Costs        
Building & Improvements 4,169      
Costs Capitalized Subsequent to Acquisition        
Building & Improvements 20      
Gross Value at Close of Period        
Building & Improvements 4,189      
Hialeah-MOB        
Gross Value at Close of Period        
Total Assets 11,027      
Accumulated Depreciation 1,708      
Hialeah-MOB | Land & Improvements        
Initial Costs        
Land & Improvement 264      
Gross Value at Close of Period        
Land & Improvements 264      
Hialeah-MOB | Buildings        
Initial Costs        
Building & Improvements 10,349      
Costs Capitalized Subsequent to Acquisition        
Building & Improvements 414      
Gross Value at Close of Period        
Building & Improvements 10,763      
Mentor-MOB        
Gross Value at Close of Period        
Total Assets 9,391      
Accumulated Depreciation 679      
Mentor-MOB | Land & Improvements        
Initial Costs        
Land & Improvement 2,603      
Gross Value at Close of Period        
Land & Improvements 2,603      
Mentor-MOB | Buildings        
Initial Costs        
Building & Improvements 6,544      
Costs Capitalized Subsequent to Acquisition        
Building & Improvements 244      
Gross Value at Close of Period        
Building & Improvements 6,788      
Athens 200-MOB        
Gross Value at Close of Period        
Total Assets 1,839      
Accumulated Depreciation 225      
Athens 200-MOB | Land & Improvements        
Initial Costs        
Land & Improvement 369      
Gross Value at Close of Period        
Land & Improvements 369      
Athens 200-MOB | Buildings        
Initial Costs        
Building & Improvements 1,470      
Gross Value at Close of Period        
Building & Improvements 1,470      
Lemoyne-MOB/Imaging        
Gross Value at Close of Period        
Total Assets 4,432      
Accumulated Depreciation 349      
Lemoyne-MOB/Imaging | Land & Improvements        
Initial Costs        
Land & Improvement 412      
Gross Value at Close of Period        
Land & Improvements 412      
Lemoyne-MOB/Imaging | Buildings        
Initial Costs        
Building & Improvements 4,020      
Gross Value at Close of Period        
Building & Improvements 4,020      
Gainesville [Member]        
Gross Value at Close of Period        
Total Assets 4,729      
Accumulated Depreciation 409      
Gainesville [Member] | Land & Improvements        
Initial Costs        
Land & Improvement 631      
Gross Value at Close of Period        
Land & Improvements 631      
Gainesville [Member] | Buildings        
Initial Costs        
Building & Improvements 4,098      
Gross Value at Close of Period        
Building & Improvements 4,098      
Grand Rapids Facility [Member]        
Gross Value at Close of Period        
Total Assets 6,810      
Accumulated Depreciation 559      
Grand Rapids Facility [Member] | Land & Improvements        
Initial Costs        
Land & Improvement 1,459      
Gross Value at Close of Period        
Land & Improvements 1,459      
Grand Rapids Facility [Member] | Buildings        
Initial Costs        
Building & Improvements 5,246      
Costs Capitalized Subsequent to Acquisition        
Building & Improvements 105      
Gross Value at Close of Period        
Building & Improvements 5,351      
Sarasota Facility [Member]        
Gross Value at Close of Period        
Total Assets 4,865      
Accumulated Depreciation 352      
Sarasota Facility [Member] | Land & Improvements        
Initial Costs        
Land & Improvement 831      
Gross Value at Close of Period        
Land & Improvements 831      
Sarasota Facility [Member] | Buildings        
Initial Costs        
Building & Improvements 4,034      
Gross Value at Close of Period        
Building & Improvements 4,034      
Greenwood [Member]        
Gross Value at Close of Period        
Total Assets 5,945      
Accumulated Depreciation 482      
Greenwood [Member] | Land & Improvements        
Initial Costs        
Land & Improvement 1,122      
Costs Capitalized Subsequent to Acquisition        
Land & Improvements 82      
Gross Value at Close of Period        
Land & Improvements 1,204      
Greenwood [Member] | Buildings        
Initial Costs        
Building & Improvements 4,692      
Costs Capitalized Subsequent to Acquisition        
Building & Improvements 49      
Gross Value at Close of Period        
Building & Improvements 4,741      
Fairbanks Facility [Member]        
Gross Value at Close of Period        
Total Assets 15,191      
Accumulated Depreciation 828      
Fairbanks Facility [Member] | Land & Improvements        
Initial Costs        
Land & Improvement 1,997      
Costs Capitalized Subsequent to Acquisition        
Land & Improvements 38      
Gross Value at Close of Period        
Land & Improvements 2,035      
Fairbanks Facility [Member] | Buildings        
Initial Costs        
Building & Improvements 13,015      
Costs Capitalized Subsequent to Acquisition        
Building & Improvements 141      
Gross Value at Close of Period        
Building & Improvements 13,156      
Rocky Point Facility [Member]        
Gross Value at Close of Period        
Total Assets 7,396      
Accumulated Depreciation 476      
Rocky Point Facility [Member] | Land & Improvements        
Initial Costs        
Land & Improvement 836      
Gross Value at Close of Period        
Land & Improvements 836      
Rocky Point Facility [Member] | Buildings        
Initial Costs        
Building & Improvements 6,534      
Costs Capitalized Subsequent to Acquisition        
Building & Improvements 26      
Gross Value at Close of Period        
Building & Improvements 6,560      
Fairfax Facility [Member]        
Gross Value at Close of Period        
Total Assets 18,354      
Accumulated Depreciation 1,148      
Fairfax Facility [Member] | Land & Improvements        
Initial Costs        
Land & Improvement 4,410      
Gross Value at Close of Period        
Land & Improvements 4,410      
Fairfax Facility [Member] | Buildings        
Initial Costs        
Building & Improvements 13,548      
Costs Capitalized Subsequent to Acquisition        
Building & Improvements 396      
Gross Value at Close of Period        
Building & Improvements 13,944      
Lees Summit Facility [Member]        
Gross Value at Close of Period        
Total Assets 6,081      
Accumulated Depreciation 365      
Lees Summit Facility [Member] | Land & Improvements        
Initial Costs        
Land & Improvement 1,431      
Gross Value at Close of Period        
Land & Improvements 1,431      
Lees Summit Facility [Member] | Buildings        
Initial Costs        
Building & Improvements 4,512      
Costs Capitalized Subsequent to Acquisition        
Building & Improvements 138      
Gross Value at Close of Period        
Building & Improvements 4,650      
Lexington Facility [Member]        
Gross Value at Close of Period        
Total Assets 14,152      
Accumulated Depreciation 720      
Lexington Facility [Member] | Land & Improvements        
Initial Costs        
Land & Improvement 2,049      
Costs Capitalized Subsequent to Acquisition        
Land & Improvements 61      
Gross Value at Close of Period        
Land & Improvements 2,110      
Lexington Facility [Member] | Buildings        
Initial Costs        
Building & Improvements 11,905      
Costs Capitalized Subsequent to Acquisition        
Building & Improvements 137      
Gross Value at Close of Period        
Building & Improvements 12,042      
Toledo Facility [Member]        
Gross Value at Close of Period        
Total Assets 16,816      
Accumulated Depreciation 1,184      
Toledo Facility [Member] | Land & Improvements        
Initial Costs        
Land & Improvement 3,581      
Gross Value at Close of Period        
Land & Improvements 3,581      
Toledo Facility [Member] | Buildings        
Initial Costs        
Building & Improvements 12,613      
Costs Capitalized Subsequent to Acquisition        
Building & Improvements 622      
Gross Value at Close of Period        
Building & Improvements 13,235      
Lake Geneva Facility [Member]        
Gross Value at Close of Period        
Total Assets 5,495      
Accumulated Depreciation 290      
Lake Geneva Facility [Member] | Land & Improvements        
Initial Costs        
Land & Improvement 585      
Costs Capitalized Subsequent to Acquisition        
Land & Improvements 68      
Gross Value at Close of Period        
Land & Improvements 653      
Lake Geneva Facility [Member] | Buildings        
Initial Costs        
Building & Improvements 4,842      
Gross Value at Close of Period        
Building & Improvements 4,842      
Glenview Facility [Member]        
Gross Value at Close of Period        
Total Assets 8,724      
Accumulated Depreciation 522      
Glenview Facility [Member] | Land & Improvements        
Initial Costs        
Land & Improvement 1,688      
Gross Value at Close of Period        
Land & Improvements 1,688      
Glenview Facility [Member] | Buildings        
Initial Costs        
Building & Improvements 6,536      
Costs Capitalized Subsequent to Acquisition        
Building & Improvements 500      
Gross Value at Close of Period        
Building & Improvements 7,036      
Canandaigua Facility [Member]        
Gross Value at Close of Period        
Total Assets 12,757      
Accumulated Depreciation 670      
Canandaigua Facility [Member] | Land & Improvements        
Initial Costs        
Land & Improvement 948      
Gross Value at Close of Period        
Land & Improvements 948      
Canandaigua Facility [Member] | Buildings        
Initial Costs        
Building & Improvements 11,606      
Costs Capitalized Subsequent to Acquisition        
Building & Improvements 203      
Gross Value at Close of Period        
Building & Improvements 11,809      
Hermitage Facility [Member]        
Gross Value at Close of Period        
Total Assets 4,690      
Accumulated Depreciation 282      
Hermitage Facility [Member] | Land & Improvements        
Initial Costs        
Land & Improvement 548      
Gross Value at Close of Period        
Land & Improvements 548      
Hermitage Facility [Member] | Buildings        
Initial Costs        
Building & Improvements 4,118      
Costs Capitalized Subsequent to Acquisition        
Building & Improvements 24      
Gross Value at Close of Period        
Building & Improvements 4,142      
Redding Facility [Member]        
Gross Value at Close of Period        
Total Assets 5,064      
Accumulated Depreciation 133      
Redding Facility [Member] | Land & Improvements        
Initial Costs        
Land & Improvement 945      
Gross Value at Close of Period        
Land & Improvements 945      
Redding Facility [Member] | Buildings        
Initial Costs        
Building & Improvements 4,119      
Gross Value at Close of Period        
Building & Improvements $ 4,119      
Minimum | Land & Improvements        
Gross Value at Close of Period        
Remaining useful life 1 year      
Minimum | Buildings        
Gross Value at Close of Period        
Remaining useful life 9 years      
Minimum | Tenant improvements [Member]        
Gross Value at Close of Period        
Remaining useful life 1 year      
Maximum | Land & Improvements        
Gross Value at Close of Period        
Remaining useful life 15 years      
Maximum | Buildings        
Gross Value at Close of Period        
Remaining useful life 47 years      
Maximum | Tenant improvements [Member]        
Gross Value at Close of Period        
Remaining useful life 15 years